Low Volume Manufacturing
Low volume production means to run a certain number of molded parts with rapid toolings in a short time. It covers plastic injection molding, pressure die casting, aluminum or plastic extrusion and silicone compression in Hord.
There is no any limit of Minimum Order Quantity (MOQ), it can be 5,000, or 500, 100, even 10 pcs, just base demand of customer. But there is set-up cost for each batch production of each mold, because need to purge the machine, heat the mold and adjust the molding parameter etc. But cost is small, the cost difference is from machine size, material type and color etc. Each batch of part production always was followed up ISO 9001 or IATF 16949 quality controlling procedure, make sure all the dimensions and cosmetic quality fall in the specified requirement. The quality report and material certificate can be provided with each shipment except some special reason.
Fast delivery time always is our competitive factor, we can run and ship it out within 3 days if there is available material in our stock. If need to purchase material, the lead time almost is relative to how long to get the material. We will confirm the delivery date with 24 hours after we receive purchase order. For pressure die casting, aluminum extrusion, silicone compression, material always is no problem except special demand. Generally the unit price will be a little higher than high volume production of multi-cavity mold. It was related to coolingy time, cavity number, automatic or manual run etc. So before the tooling making, we should make the choice according to the final demand.
Utilize The Advanced Process Of Low Volume Production
Low volume production intends to run a specific number of formed parts with rapid tooling in a brief timeframe. Hord will provide the quality and advanced Rapid Prototyping solutions, however, our attention is on satisfying and surpassing the majority of our client's necessities and supporting them with their course to showcase. It covers plastic infusion forming, weight bite the dust throwing, aluminum or plastic expulsion and silicone pressure in Hord. When the improvement stage is nearing fulfillment and plans are settled, following prototype production, we are frequently approached to give either Low Volume Production solutions or a scaffold to production.
Top notch process:
We will affirm the conveyance date with 24 hours after we get buy request. Quick conveyance time dependably is our focused factor; we can run and ship it out around 3 days if there is accessible material in our stock. Normally this will be either to test the market with another product or to dispatch a high worth, specialty product. The quality report and material declaration can be given every shipment aside from some uncommon reason. In case need to buy material, the lead time nearly is with respect to what extent to get the material.
Enhanced advantages:
We can offer a scope of solutions to this end; however, the key advantage is that the underlying tooling expenses are essentially lower than high volume production forms. For the most part, the unit cost will be somewhat higher than the high volume production of multi-cavity form. It was identified with cooling time, pit number, programmed or manual run and so forth. Rapid Prototyping materials have progressed altogether over ongoing years and now offer enough soundness and usefulness to be utilized for Low Volume Production. So before the tooling making, we should settle on the decision as per the last interest.

Plastic Injection Molding

Pressure Die Casting

Plastic & Aluminum Extrusion
